Skip to Content
Devvarena UI

Timeline

A connected activity feed with flexible event content, timestamps, and cards.

Default

Project activity

A little momentum, one update at a time.

Alex moved the project to

Ready to ship

Design handoff is ready

Updated flows, interaction notes, and assets are in the shared workspace.

Open handoff notes

Sam approved the final review

Jordan joined the workspace

4 recent updatesAll times in UTC

Horizontal

Order received

Packed

Shipped

Feed

Design approved

The team approved the new flow.

Review completed

Feedback was resolved.

Delivery

On its way

Shipment ST–2048 · Expected today

In transit

Out for delivery

Your parcel is with your local courier.

Arrived at the local depot

Northside distribution center

Collected from the sender

Tracking updates are now available.

Shipping label created

The sender prepared your order.

Branch

Release journal

Related updates stay together, without crowding the feed.

Version 2.4 is live

Release notes sent to the team

Everything you need for a smooth handoff, in one place.

Show 2 related updates

Migration guide updated

Includes examples for existing projects.

Accessibility review completed

Sam joined the release team

Community walkthrough

Scheduled · Bring your questions and ideas.

Loading

Activity

Loading the latest updates…

Empty

Workspace activity

Your team's story starts here.

Nothing to catch up on

New comments, shared files, and project updates will appear here.

Retry

Recent activity

Keep errors local to the feed.

Activity could not be loaded.

We couldn't load your activity

Your existing work is safe. Give the feed another try.

Marker Styles

A quieter rhythm

Choose a rail and marker treatment to suit the information.

Soft markers · Solid rail

Review completed
Draft shared with the team

Outline markers · Dashed and solid rails

Next: team walkthrough
Planned: release sign-off
Planned: publish the release

Plain markers · Solid rail

Access permissions updated
Workspace settings exported

Versions

Version history

The milestones and small improvements along the way.

Version 6.0. Latest release.

Added two new lessons

Alex Morgan
Version 5.0.

New lesson images, quizzes, and a refreshed course survey

Sam Rivera
Version 4.0.

Updated the illustrations in lesson two

Jordan Lee

Refined quiz questions and answer explanations

Casey Chen

Improved the lesson ten walkthrough

Casey Chen
Version 3.0.

Updated the introduction examples

Alex Morgan

Activity Filter

Northstar activity

Meetings, shared files, and the conversations between them.

Showing all activity.

Upcoming

Scheduled

Northstar × Studio — project check-in

Review the handoff and agree on the next milestone.

Alex, Sam, Casey and Jordan are invited
Show 2 more upcoming activities
Customer onboarding walkthrough
Success team introduction

This week

Alex Morgan added a file to the workspace

northstar-sales-brief.pdf

Sam Rivera added Northstar to Customer success

Casey Chen left a handoff note

The handoff is approved. Let's introduce the customer success team and keep the momentum going.